A customer from France wanted to order two dormitory buildings with 48 rooms for students from our production unit.
A customer from France wanted to order two dormitory buildings with 48 rooms for students from our production unit. The finishing time was unrealistically short, as well as the engineering and architectural solutions had been only partially developed.The customer had contacted several other service providers, but decided upon us due to our flexibility and the deadline.
In order to pull the project through, our engineers designed more than 1,100 technical blueprints in a very short time. When the drafts were finished, the customer approved them.
The project was carried out despite the busy schedule and half-finished blueprints. Ideally, in order to achieve the best results, the architectural and engineering drafts should be already finished before the production.
We manufactured and transported on the site 96 room elements of single dormitory rooms.
Photo 1. The main contractor is building the foundation on site:
Photo 2. Manufacturing process of 96 modules in our production unit:
Photo 3. Modules right before loading on vehicles:
Foto 4. Installation and construction works:
Photo 5. Finished object: